Piedras Negras

Solar project with batteries under development · 120 MW · Veracruz

Piedras Negras is a 120 MW solar project under development in Veracruz, Mexico, with 36 MW / 108 MWh of battery storage (BESS). It was awarded in the first CFE priority-node tender and construction is scheduled to start in January 2027; it is not yet operating. It belongs to the portfolio of GEMEX Energía, part of Grupo GEMEX (Grupo Energía México).

The investment is US $160M and the offtake is with LUXEM Energía. It is part of the solar portfolio of GEMEX Energía: 979 MW under development in 10 utility-scale projects.

Project facts

Project facts: Piedras Negras
TechnologySolar with battery storage (BESS)
Capacity120 MW of solar under development
Storage36 MW / 108 MWh of batteries (BESS), under development
StateVeracruz, Mexico
StatusUnder development (not operating)
AwardFirst CFE priority-node tender
Scheduled start of constructionJanuary 2027
InvestmentUS $160M
OfftakerLUXEM Energía

About GEMEX Energía

GEMEX Energía is the subsidiary of Grupo Energía México (Grupo GEMEX) dedicated to the development, construction and operation of wind and solar energy projects in Mexico. Its portfolio is 2,230 MW: 271 MW of wind in operation, 980 MW of wind pipeline and 979 MW of solar under development.